Hill Hiker®’s portion of the install takes about 1-2 week for most projects.
Project Phases:
– Pre-construction: design, engineering, permitting, planning
– Manufacturing: ordering, fabrication, material finish, assembly, QC, shipping
– Installation: clearing, foundation, system install, landings, inspection, close out
The entire project duration from start (down payment) to finish (inspection) can vary greatly and depends on many factors such as the complexity of the system, material ordering lead times, the level of engineering, permitting and inspection needed, the foundation and landings type, shipping, etc. Because many of these tasks are out of Hill Hiker®’s control, it can be very hard to give accurate and complete timelines. If you want to learn more about the project process, check out our Manufacturing and Installation Process page or contact us.